PROJECT: realization of a pilot plant for the valorisation of urban waste.
TERRITORIAL AREA: area of 100,000 inhabitants that from the calculations made, represents a sustainable dimension both from an economic and environmental point of view.
PROCESS: – waste collection (door-to-door differentiation with four ecological islands to integrate the system)
– enhancement of the wet part in terms of energy
– selection of the multi-material part
– production of a second raw material

PROJECT MODEL: proposable again for other territorial realities.