The work phases for the recovery of solid urban waste can be summarized as follows:

  • acceptance and storage of waste;
  • material shredding and preparation;
  • anaerobic digestion and biogas production in watertight cells (30 days);
  • electricity production;
  • aerobic stabilization (20 days);
  • cooling of materials;
  • storage for compost use;
  • air (filter) and water (purifier) treatment.

General project data