
The work phases for the recovery of solid urban waste can be summarized as follows:

- acceptance and storage of waste;
- material shredding and preparation;
- anaerobic digestion and biogas production in watertight cells (30 days);
- electricity production;
- aerobic stabilization (20 days);
- cooling of materials;
- storage for compost use;
- air (filter) and water (purifier) treatment.
General project data

